July w4 2026

Very productive week! Was able to knock out a bunch of things that have been backburner for a while all at once. These were mostly software and some heavy planning into our routes forward, and what each path will require from a software, hardware, advising, and regulatory route. The critical path isn’t yet fully sharp, but it’s coming into focus. The heavy lift to get the physically based compression modeling is done, which is phenomenal, so we’ll be dovetailing this with a chainmesh deformation model in the coming few weeks to be able to control compression much more closely than ever before.